Open Map
Close Map
N
Projections and Nav Modes
  • Normal View
  • Fisheye View
  • Architectural View
  • Stereographic View
  • Little Planet View
  • Panini View
Click and Drag / QTVR mode
Partager ce panorama
For Non-Commercial Use Only
This panorama can be embedded into a non-commercial site at no charge. Lire plus
Do you agree to the Terms & Conditions?
For commercial use, Contactez nous
Embed this Panorama
LargeurHauteur
For Non-Commercial Use Only
For commercial use, Contactez nous
LICENSE MODAL

0 Likes

Matosinhos, Leixoes, harbour
Portugal

The construction of the harbour has undoubtedly changed the social and economic characteristics of the village, introducing a cosmopolitan and city-style urban character. It was also the basis for creating the largest fishing fleet in the country and driving the canning industry.The construction of the shelter port was initiated in 1884, a project by Eng. Nogueira Soares, and was completed in 1895. However, it went through several phases of construction in order to optimize the space. The year 1932 is remembered, when the project for dock No. 1 was carried out, where around 1.5 million cubic meters of land were excavated, using 100,000 m3 of concrete and stone. The construction that looks like, as we pass the Mobile Bridge, a tiny dock, caused a real revolution in the urban networks of Matosinhos and Leça. The port and its avenues "knocked down" hundreds of riverside houses on both banks of the Laça. Only in 1940 would the port be opened.The port revolution "transported" the means of communication of the new times, namely the inauguration of railway lines. However, from the 1950s onwards, the port and dock No. 1 became obsolete due to the increase in traffic, hence its expansion through the construction of the second dock. Dock No. 2 becomes the largest engineering undertaking carried out in Leixões, forcing the excavation of 2 million cubic meters of earth and rocks, allowing docking in the enclosure of large tonnage vessels and the respective maneuver.1883 Open international tender for the definitive construction of the Port of Leixões. Bidding basis for the work - 4,500 contos de reis. The company «Dauderni et Duparchy» is awarded1884 Start of construction; on the North side with 1,579 meters and on the South side with 1,147), which rooted in the beaches adjacent to the mouth of the River Leça, formed a cove with about 95 hectares, with bottoms between 7 and 16 meters deep. 50t granite blocks from S.Gens were worked on leixões.

Copyright: Santiago Ribas 360portugal
Type: Spherical
Resolution: 15960x7980
Taken: 12/05/2020
Chargée: 04/11/2020
Published: 05/11/2020
Affichages ::

...


Tags:
More About Portugal


It looks like you’re creating an order.
If you have any questions before you checkout, just let us know at [email protected] and we’ll get right back to you.